Monday, March 17, 2008
Brackets added to the top edge of stringers and frames
Many many pieces of 3/4 x 3/4 pine added to beef up the top edge of all structural parts. Epoxy glue thickened with wood flour and pvc clamps to hold all in place. this is the last step before laying the decks, well almost the last step. I have quite a lot of good closed cell foam that I am thinking of laying in all of the empty spaces under the deck except for near the bow where I will have an anchor locker.