Monday, April 28, 2008

Joints on Pilot House Taped.

The pilot house is progressivly stronger as seans are taped. Roof will be strengthened wit lateral beams which will fall under the grab rails for double duty as stiffeners and as a backer for the rails but first the roof will be sheathed with 12 oz. biaxial fabric.